Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 38718 |
VISUAL PROCESS BEFOR GLUE |
Ashish Kr Singh , 55586 |
Kartik Rautela , 55955 , 40004 |
EARLIER WE HAVE VISUAL DONE AFTER GLUE PROCESS . AFTER GLUE DONE USB UPLIFT NOT VISIBLE SO FAILURE SKIP FROM OPERATOR & FOUND IN ASSEMBLY . | NOW PROCESS CHANGE & VISUAL DONE BEFOR GLUE AT POST AOI . NOW DEFECT CONTROL FOR USB UPLIFT IN ASSEMBLY . | 06/2023 | ||
| 2 | LCIK - 38785 |
Visual method changed . |
Subhash chandra yadav , 51008656 |
Pawan Kumar Yadav , 51010085 Firasat ali , 51008645 |
Earlier we are doing only top side visual of Sub PCBA USB jack .Due to huge chances of skipage USB uplift issue. | Now we started both side(top & bottom) visual inspection of Sub PCBA USB jack in model Yuva 2 PRO.After that controlled USB jack uplift issue | 06/2023 | ||
| 3 | LCIK - 39076 |
Visual method changed . |
Pawan Kumar Yadav , 51010085 |
Janaki Ballav Pattanaik , 51009457 |
Earlier we are doing only top side visual of Sub PCBA USB jack .Due to huge chances of skipage USB uplift issue. | Now we started both side(top & bottom) visual inspection of Sub PCBA USB jack in model Yuva 2 PRO.After that controlled USB jack uplift issue . | 11/2023 | ||
| Previous 66 67 68 69 70 Next | |||||||||