Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 42780 |
Productivity improvement |
Krishna Kumar Singh , 51010395 |
Before there was no any identification on front and back protective case . Due to this new manpower does not understand easily that which Models this protective case ? Also time taken for discovering as well as productivity became down due to this . | Now we have printed model wise name on back and front protective case. For doing this problem has solved . | 07/2025 | |||
| 2 | LCIK - 37149 |
Productivity Improvement |
Rajat Kumar , 51009439 |
Prabhat Kumar Kushwaha , 43564 |
Before we used a 500 mm in this conveyor only one board present at a same time . | At line no 4 we installed 1000 mm length conveyor due to this 3 boards are present on conveyor at the same time. so no need to manual feeding | 07/2022 | ||
| 3 | LCIK - 37150 |
Productivity Improvement |
Rajat Kumar , 51009439 |
Prabhat Kumar Kushwaha , 43564 |
At line no.1 on cooling conveyor (before AOI) have a timer switch .Some time operator without knowledge he set the timer 1 sec or 2 sec due to this board enter in AOI after 1 sec and 2 sec. its effect in our production plan, | Now we fix with a gum in 0 range for prevention delay time. | 08/2022 | ||