Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 37140 |
Productivity Improvement |
, 51009680 |
AJAY SHARMA , 44715 |
Before, the solvent pipe for cleaner gets damaged from sharper pointer paper roller pulley and the sensor starts mis-behaving because of dek pro solvent gets on Sensor. | After, We have changed the routing assembly of solvent movement spray pipe of cleaner away from sharper pulley roller and know no chance of getting hit or cut. | 09/2022 | ||
| 2 | LCIK - 37141 |
Productivity Improvement |
, 51009680 |
AJAY SHARMA , 44715 |
Before, their is no lock on temperature up down profile. there is chance of anybody can distrub the temperature of baking oven while working mode and it can heat PCB or material at more temperaure | After, know the display is locked with internal settings and nobody can distrub the temp without authorized member of maintenance. | 09/2022 | ||
| 3 | LCIK - 41749 |
Productivity Improvement |
Krishna Kumar Singh , 51010395 |
When we changeover from feature phone to smartphone, we have to do IMEI label printer movement, it is a waste of time. | We talked to PE, PQC or Production to get the IMEI label stage fixed as same feature phone. Due to this we will not be delayed in the change over time will not be wasted | 11/2024 | |||
| Previous 670 671 672 673 674 Next | |||||||||