Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 39691 |
Productivity Improvement |
Yashbir , 51008101 |
Brajesh , 51009217 Pushpendra Pal , 51010202 |
02/2024 | ||||
| 2 | LCIK - 40204 |
Productivity Improvement |
, 51010344 |
VIPIN KUMAR , 82224 Vimal Prajapati , 45301 |
Before, Reflow cooling zone already had a plus screw and it had to be opened and cleaned every week, while cleaning the reflow there was not much space available due to which there was a problem in opening the cooling zone and screw was not visible properly and it used to get covered with flux. | After, we have installed all the cooling zone with L-N bolts so that the bolt look appropriate and we can open the cooling zone easily and bolts do not get damaged | 04/2024 | ||
| 3 | LCIK - 37136 |
Productivity Improvement |
Rajat Kumar , 51009439 |
AJAY SHARMA , 44715 |
Before,In Chiller of all reflow oven we could not measure low level and high level of DI water due to that in case of low level reflow oven starts giving alarm and result reflow operation effected. | After, we define high and low level sticker for DI water so that we can check the measurement and can fill it before it reach low level. In this way we maintain the issue and it improve process and no loss effect to production. | 09/2022 | ||
| Previous 668 669 670 671 672 Next | |||||||||