** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 42497
Productivity Improvement
Parupkar Singh Brar , 51010649
At line no.2 on cooling conveyor (before AOI) have a timer switch .Some time operator without knowledge he set the timer 1 sec or 2 sec due to this board enter in AOI after 1 sec and 2 sec. its effect in our production plan, At line no.2 on cooling conveyor (before AOI) have a timer switch .Some time operator without knowledge he set the timer 1 sec or 2 sec due to this board enter in AOI after 1 sec and 2 sec. its effect in our production plan, 05/2025
2 LCIK - 39682
Productivity Improvement
, 51009680
Krishna Puri , 166868
Before: In the router stage, we were facing a significant dust issue in PCB across all models. 02/2024
3 LCIK - 41730
Productivity Improvement
Anurag Shukla , 51009676
Krishna Puri , 166868
Connector cable wair damage due to this tray unit not work properly. Now we repair the power connector of tray unit then running ok. 10/2024
 Previous  664  665  666  667  668 Next