Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 42497 |
Productivity Improvement |
Parupkar Singh Brar , 51010649 |
At line no.2 on cooling conveyor (before AOI) have a timer switch .Some time operator without knowledge he set the timer 1 sec or 2 sec due to this board enter in AOI after 1 sec and 2 sec. its effect in our production plan, | At line no.2 on cooling conveyor (before AOI) have a timer switch .Some time operator without knowledge he set the timer 1 sec or 2 sec due to this board enter in AOI after 1 sec and 2 sec. its effect in our production plan, | 05/2025 | |||
| 2 | LCIK - 39682 |
Productivity Improvement |
, 51009680 |
Krishna Puri , 166868 |
Before: In the router stage, we were facing a significant dust issue in PCB across all models. | 02/2024 | |||
| 3 | LCIK - 41730 |
Productivity Improvement |
Anurag Shukla , 51009676 |
Krishna Puri , 166868 |
Connector cable wair damage due to this tray unit not work properly. | Now we repair the power connector of tray unit then running ok. | 10/2024 | ||
| Previous 664 665 666 667 668 Next | |||||||||