Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 39673 |
Productivity improvement in A5 23 Packing |
Amit Pratap Singh , 51009908 |
1. charger scanning with handset IMEI 2. Place charger in GB Before there was 2 M/P due to GB design in all models which have inner flap (A5 & A5 2023) | Now 1. Charger scanning & pick handset & scan handset IMEI & place charger in GB Improvement - Now no need to pick GB to the work bench, Operator is placing charger in GB on conveyor itself. Now 1 Manpower is enough for this work content | 02/2024 | |||
| 2 | LCIK - 40078 |
Productivity Improvement and cost saving |
Prabhat kumar kushwaha , 51009705 |
Rohit kumar ray , 51009727 |
Power supply got Ng of reel counter machine. Due to this machine under breakdown. | To improve equipment uptime and reduce costs we have repaired the reel counter machine SMPS in-house using some parts from old Ng SMPS units. in this way we have reduce down time and save cost too. | 04/2024 | ||
| 3 | LCIK - 41366 |
Productivity improvement & question answers improvements |
, 51010432 |
There are a lot manpower is failed due to tough & hard questions in joining exams of operators. failing rate is reached at 65%, | now then we changed and replaced the Questions make them their level, and covert them on their profile. Failing criteria is reduced at only 20%. | 07/2024 | |||