Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 39672 |
Productivity improvement in Yuva 3 by rearranging process |
Amit Pratap Singh , 51009908 |
1. Input sub PCBA & fix earphone sleeve 2. Fix USB sleeve 3. Scan sub PCBA & fix sub PCBA in TP slot But there is scanning issue & scanning stage had no excess time | Now we rearranged process as given below & there is no issue 1. Input sub PCBA & fix earphone sleeve 2. Fix USB sleeve & fix sub PCBA in TP slot 3. Scan sub pcba with TP 2D | 02/2024 | |||
| 2 | LCIK - 42595 |
Productivity Improvement in pkg section |
Manish prajapati , 51010516 |
Manish prajapati , 51010516 |
only one conveyor run for both section FT and packing side | if will be seperate conveyor for FT and packing side then if FT will face with any issue in FT section then Packing conveyor will continue and my packing productivity will not be disturb. | 06/2025 | ||
| 3 | LCIK - 43731 |
Productivity Improvement in pkg section |
Pankaj Tiwari , 51010434 |
The darkness of the QR code of the charger being made on the charger line was low. After the charger reached the floor, proper scanning was not happening due to which the line was getting hampered. | The problem occurring in charger scanning was rectified with the help of my testing team by correcting the cracks in the charger code due to which now the charger is being scanned properly on line. | 02/2026 | |||