Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 41551 |
productivity(process implement ) |
Priyamjit Paul , 51009135 |
RAMAKRISHNA PRADHAN , 30166 |
The Yuva 5G Unisoc chipset vendor is asking to use the CMW100 for RF testing. We don't have cmw100 for this test. | We now work with the Lightpoint team to investigate Unisoc RF testing using IQstream 5G testers. After the modification setup with the ODM tool we are now using our IQStream tester for the Unisoc chipset | 09/2024 | ||
| 2 | LCIK - 41552 |
productivity(process implement ) |
, 51010474 |
RAMAKRISHNA PRADHAN , 30166 |
Before the process was as per given below 1. P/L sensor, Gravity sensor and finger print sensor test 2. Gsensor calibration and magnetic sensor test & GPS test Before total FT manpower was 15 | Now we merged both process & saved 1 M/P P/L sensor test, Gravity sensor Test, Finger print test & G sensor Calibration, magnetic sensor test & GPS test ( 1 M/P ) Now FT manpower is 14 & same we will implement in other similar smart phone | 09/2024 | ||
| 3 | LCIK - 43458 |
productivity(process implement ) |
Sachin yadav , 51009625 |
Anurag Pathak , 30154 |
Now After PCBA Fitment No check for LED wire should be in B- Shell Groove | After update the SOP -4 paste will ensure that led wire should be B-shell groove properly | 12/2025 | ||
| Previous 652 653 654 655 656 Next | |||||||||