** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 43959
Proper installation of landline near material lift 1st floor
Shivam Singh , 51010711
04/2026
2 LCIK - 42729
PROJECT& MODEL NAME MENTIONED IN JIGS
mohammad salman , 51010612
chandra shekhar , 51009333
J.BASU , 51010276
In the SMT/ JIG area, many jigs do not have clear, standardized labeling for the model name and project name. This leads to confusion, setup delays, and occasional use of the wrong jig for the wrong product. Increased time in identifying correct jigs. Higher chance of setup error. Poor traceability and accountability. AFTER Introduce a standardized labeling system on all jigs that includes: Model Name Project Name Implemented labeling for all jigs used in current projects. xpected Benefits: Reduce setup time by 20–30%. Eliminate model mismatch errors. Improve line efficiency and 5S visibility. Easier audits and part traceability. 07/2025
3 LCIK - 42732
PROJECT& MODEL NAME MENTIONED IN JIGS
RAVI KUMAR , 51009706
Vinod sapehia , 51008613
In the SMT/ JIG area, many jigs do not have clear, standardized labeling for the model name and project name. This leads to confusion, setup delays, and occasional use of the wrong jig for the wrong product. Increased time in identifying correct jigs. Higher chance of setup error. Poor traceability and accountability. AFTER Introduce a standardized labeling system on all jigs that includes: Model Name Project Name Implemented labeling for all jigs used in current projects. xpected Benefits: Reduce setup time by 20–30%. Eliminate model mismatch errors. Improve line efficiency and 5S visibility. Easier audits and part traceability. 07/2025
 Previous  649  650  651  652  653 Next