Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43959 |
Proper installation of landline near material lift 1st floor |
Shivam Singh , 51010711 |
04/2026 | |||||
| 2 | LCIK - 42729 |
PROJECT& MODEL NAME MENTIONED IN JIGS |
mohammad salman , 51010612 |
chandra shekhar , 51009333 J.BASU , 51010276 |
In the SMT/ JIG area, many jigs do not have clear, standardized labeling for the model name and project name. This leads to confusion, setup delays, and occasional use of the wrong jig for the wrong product. Increased time in identifying correct jigs. Higher chance of setup error. Poor traceability and accountability. | AFTER Introduce a standardized labeling system on all jigs that includes: Model Name Project Name Implemented labeling for all jigs used in current projects. xpected Benefits: Reduce setup time by 20–30%. Eliminate model mismatch errors. Improve line efficiency and 5S visibility. Easier audits and part traceability. | 07/2025 | ||
| 3 | LCIK - 42732 |
PROJECT& MODEL NAME MENTIONED IN JIGS |
RAVI KUMAR , 51009706 |
Vinod sapehia , 51008613 |
In the SMT/ JIG area, many jigs do not have clear, standardized labeling for the model name and project name. This leads to confusion, setup delays, and occasional use of the wrong jig for the wrong product. Increased time in identifying correct jigs. Higher chance of setup error. Poor traceability and accountability. | AFTER Introduce a standardized labeling system on all jigs that includes: Model Name Project Name Implemented labeling for all jigs used in current projects. xpected Benefits: Reduce setup time by 20–30%. Eliminate model mismatch errors. Improve line efficiency and 5S visibility. Easier audits and part traceability. | 07/2025 | ||
| Previous 649 650 651 652 653 Next | |||||||||