Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 38197 |
Wall safety in FG PCB verification area. |
Dimple Kumar , 52392 |
CHANDANA MALIKA , 44659 , 40058 |
Earlier wall used to get damaged during physical verification of PCBA | Safety corner has been installed for wall safety, so that there will be no wall damage. | 03/2023 | ||
| 2 | LCIK - 38976 |
Wall safety in FG PCB verification area. |
Dimple Kumar , 52392 |
Earlier wall used to get damaged during physical verification of PCBA | Safety corner has been installed for wall safety, so that there will be no wall damage. | 10/2023 | |||
| 3 | LCIK - 43693 |
Wall Safety Guard Placed in material lift to save lift wall |
Shivam Singh , 51010711 |
Lift wall got scratch during kitting or fg movement | 02/2026 | ||||
| Previous 63 64 65 66 67 Next | |||||||||