Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 39948 |
Provide equipment on time |
Mukesh Mishra , 51009471 |
After NPI Blaze curve jig not provide repair team for open battery cover. so this model battery cover is damage during opening battery cover with out jig. | NPI time all process are new to operator so maximum process are generate during production. When NPI team provide Blaze curve jig at NPI time so this model battery cover not damage(scrap) during opening and company cost are save to make this device blaze curve and we plan to make maximum quantity. | 03/2024 | |||
| 2 | LCIK - 37225 |
Provide air supply |
Subhash chandra , 51009482 |
, 64799 |
11/2022 | ||||
| 3 | LCIK - 43692 |
Protective Cover Development |
Parwez Heyat , 51010569 |
02/2026 | |||||
| Previous 647 648 649 650 651 Next | |||||||||