** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 43516
Quality
Krishna Kumar Singh , 51010395
Before there was no any detection in MI line to detect the opposite PCBA catch which is entry in WSM and due to this more defect generate . Now we set up a sensor before entry PCBA in WSM on conveyor to detect the opposite PCBA with the help of maintenance team . Now defect controlled . 12/2025
2 LCIK - 43518
Quality
Sumit Kumar Maurya , 59428
Previously, we using to manually batch check each part one by one line item in SAP. This process was time-consuming and took more than one hour to clearing the mrn. Now we are collaborating with the SAP team to develop the ZM2M_BATCH_CHANG T-code, which will provide a batch of all parts in a single run and all mrn clear one shot 12/2025
3 LCIK - 43519
Quality
Sumit Kumar Maurya , 59428
Kitting was done without any checklist, relying on operator memory, causing frequent wrong part selection, quantity mismatch, low accountability, and repeated errors. A 10-point checklist with dual verification is now followed, ensuring correct parts, accurate quantities, clear labeling, better accountability, and error-free kitting. 12/2025
 Previous  640  641  642  643  644 Next