Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43000 |
quality |
Sukhnendra Kumar , 30172 |
Sachin yadav , 51009625 |
During the bin scanning stage and charging vinyl removal stage, The vinyl was getting dislodged and falling onto the empty bin, but some pieces were sticking to the handset's charging port and speaker holes, potentially causing defects | At the bin scanning stage and charging vinyl removal stage, where the vinyl was being removed, we installed a vinyl collector bag. Now, all the vinyl will be collected in this bag, and none will be left in the empty bin, preventing any vinyl pieces from sticking to the handset. | 08/2025 | ||
| 2 | LCIK - 43515 |
Quality |
Krishna Kumar Singh , 51010395 |
Before there was no any detection to catch the confermation by pass ,FT 1 bypass and Aging bypass . Due to this more defect found on OQA stage . | Now we have set up a system after Shaking stage name FT2 stage to detect these defect with the help of testing team . Now these all defect controlled . | 12/2025 | |||
| 3 | LCIK - 38140 |
Quality |
Pawan Kumar , 51008876 |
lokesh kumar , 51009193 |
No one check point at line for deduction for serial no mismatch issue | check point add in packing line for checking this issue | 02/2023 | ||
| Previous 639 640 641 642 643 Next | |||||||||