Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 41956 |
quality |
Biswojit barik , 51008651 |
RF Fail coming in high Qty in Model A3 Torch During NPI. RF fail coming during NPI at RF Test Stage , After analysis found Pin uplift and poor connectivity issue coming from Antenna Pressing Machine. due to this, devices were coming fail during RF Test. | Now Improvement done in Antenna Pressing Machine and re-pressing done in All Devices after that passed all Devices and no issue coming during RF Test. | 12/2024 | |||
| 2 | LCIK - 41957 |
quality |
Krishna Kumar Singh , 51010395 |
We Have Facing high rejection of LCD Dot issue in moto A10. After analysis we have found that the LCD dot is getting created due to extra moulding part in Speaker Bracket. | After Discussion with the supplier we have done improvement in speaker bracket and the issue of LCD dot is improved. | 12/2024 | |||
| 3 | LCIK - 41958 |
quality |
Rajneesh pathak , 51009999 |
The manpower working on the weight machine work to place the handset in any direction after doing weight of the GB. | We modified the process so that after weighing the handsets we will place the GB with label in upward side on the conveyor and sent to the next stage. In this way the MRP label will be checked by the next stage operator if it is word or missing. | 12/2024 | |||
| Previous 636 637 638 639 640 Next | |||||||||