Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 41688 |
quality |
Krishna Kumar Singh , 51010395 |
Earlier there was no detection of work order on audio machine so we can not distinguish the two different model at machine. | Later we have updated the files to detect different model and color at audio stage. Now machine is only able to run one model device at a time according to work order. | 10/2024 | |||
| 2 | LCIK - 41689 |
quality |
Krishna Kumar Singh , 51010395 |
Earlier, water label was applied on all smart phones after OQA2, due to which a large number of water label were missed during assembly | Now in all smart phones it is installed before OQA2 which reduces the chances of water label getting into the missing assembly. | 10/2024 | |||
| 3 | LCIK - 41690 |
quality |
Biswojit barik , 51008651 |
Earlier we are doing only top side visual of Sub PCBA USB jack .Due to huge chances of skipage USB uplift issue. | Now we started both side(top & bottom) visual inspection of Sub PCBA USB jack in model Yuva 2 PRO.After that controlled USB jack uplift issue . | 10/2024 | |||
| Previous 633 634 635 636 637 Next | |||||||||