Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 37812 |
Quality |
Pawan Kumar , 51008876 |
Dust issue in front camera of yuva pro model | Clean room has been installed at PCBA fix stage to avoid dust issue in front camera | 01/2023 | |||
| 2 | LCIK - 40629 |
Quality |
Sourabh Rai , 51010507 |
Ajay Rawat , 51010479 |
Before there was no checkpoint in SOP to check compass in stable condition, so one defect got bypass to OQA for one. | Now, one checkpoint has been updated to check the compass in stable condition. SOP is updated for same | 05/2024 | ||
| 3 | LCIK - 40630 |
Quality |
Sourabh Rai , 51010507 |
Ajay Rawat , 51010479 |
There was no checkpoint to check the key abnormal condition at final visual inspection stage. | Two times pressing is implemented to check the volume keys and its abnormal feel. Operator now can judge the abnormal feeling of keys. From detection point of view, at 2 stations checkpoint has been implemented. | 05/2024 | ||
| Previous 629 630 631 632 633 Next | |||||||||