Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 42667 |
quality |
Jaydeep Chaturvedi , 51009711 |
We are facing high failure at RF in band 40 and 41 due to this production was getting hampered continuously. | Now we have talk to testing team and changed sequence of band 40 and 41 so that at starting time of Lte firstly it will start from band 40 then band 1 ,3,8 41 due to this value fluctuation rate reduced at some extent label. | 06/2025 | |||
| 2 | LCIK - 43435 |
Quality |
RAVISHANKAR , 30151 |
Front camera dust issue observed due to distance between front camera assemble & PCBA fitment stage, In between dust particles are fixing on camera rubber. | Distance between front camera assemble and PCBA fitment stage have been decrease so now both stages almost nearby (only 2 stages which are doing work for only front camera). | 11/2025 | |||
| 3 | LCIK - 36780 |
Quality |
Jaydeep Chaturvedi , 51009711 |
currently no check point available for vibrator check after fix vibrator in Tp due to this changes of skip vibrator not fix and create defect | After implement this type issue control from these stage and vibrator miss not skip to next stage | 08/2022 | |||
| Previous 625 626 627 628 629 Next | |||||||||