Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 37262 |
Quality |
, 51008095 |
IMEI write was being done after scanning 2d leading to wrong IMEI write in case of protective film get swapped with other leading to piggy box in packing in case of original handset. | now imei write is being done direct by system without scanning same as ion feature phone now mismatch and piggi box issue. | 11/2022 | |||
| 2 | LCIK - 36242 |
Quality |
Ganga Pratap Singh , 51009380 |
No system to cross check that main lens has pressed or not | OK Stamp will be verify that Main lens has pressed by machine and operator hasn't bypass his process which increase quality | 07/2022 | |||
| 3 | LCIK - 43419 |
Quality |
Krishna Kumar Singh , 51010395 |
Before there was no any drop test in charger floor due to this more and more shaking failure pass from the shaking stage. | Now we set up a drop tester before shaking stage .For doing this shaking issue now finished. | 11/2025 | |||
| Previous 618 619 620 621 622 Next | |||||||||