Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 37256 |
Quality |
, 51009944 |
Speaker fix stage operator also doing mic rubber fix work which increase the cycle time of it's stage, due to this operator does not perform speaker fix and route (CTQ) process properly. its cause of speaker wire poor fitment defect(Spk crack). | Now mic rubber fix work transfer to previous stage which have low take time and also it is non critical stage. Now operator perform his ctq work properly and spk crack issue eliminate from line. | 11/2022 | |||
| 2 | LCIK - 40841 |
Quality |
Sourabh Rai , 51010507 |
Ajay Rawat , 51010479 Saba Anwar , 51009386 |
There was no controlling (freezing of devices) of colour mismatch on line. recently 6 different colour devices were offered to OQA as there was no system control. | We have asked testing team to freeze the wrong workorder or colour device at initial and FVI station itself. Freezing revoking authorities will be at testing team end itself. | 06/2024 | ||
| 3 | LCIK - 40843 |
quality |
Krishna Kumar Singh , 51010395 |
Before on the soldering stage soldering mat always found in dirty condition. For this quality become down. | Now on the soldering stage soldering mat always found in clean condition because we change the soldering mat. For this quality become ok. | 06/2024 | |||