Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 42317 |
quality |
Sachin yadav , 51009625 |
The men lens of the A5 23 model is silk type so during production process this model scratch mark can occur easily on the lens. | Therefore there is a screen protection will paste on line during the production of the model for the scratch protection. | 03/2025 | |||
| 2 | LCIK - 42322 |
quality |
Sumit , 51009949 |
RF Fail coming in high Qty in Model A3 Torch During NPI. RF fail coming during NPI at RF Test Stage , After analysis found Pin uplift and poor connectivity issue coming from Antenna Pressing Machine. due to this, devices were coming fail during RF Test. | Now Improvement done in Antenna Pressing Machine and re-pressing done in All Devices after that passed all Devices and no issue coming during RF Test. | 03/2025 | |||
| 3 | LCIK - 42323 |
quality |
Rajneesh pathak , 51009999 |
Now we are sending L4 pcba without binning/manual, in this condition if that pcba will be come in failure smt then that pcba we can not punch in system, because that pcba showing in smt.... that pcba after sn tracking showing s/w,oqa mmi,packing....etc... | Now we are all L4 pcba sending process by process now we are con not sending any one pcba in manual..... in this condition we will be punch all pcba in system.... | 03/2025 | |||
| Previous 614 615 616 617 618 Next | |||||||||