Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 42570 |
quality |
Abhishek Kumar , 51010215 |
Kapil Kumar , 51010568 |
At battery cover pressing stage in all SP models some devices got bay pass from this stage and there was no any check point was available at next stage for detect the bay pass issue on line. | Now we have add scanning system in battery cover pressing jig and device will be scan in IMS and it's check point has been added at next scanning stage so that there is no any check chance that bay pass can be go. | 04/2025 | ||
| 2 | LCIK - 42315 |
quality |
Priyamjit Paul , 51009135 |
In before situation, Beep sound was coming at the time of SPK testing, in this case detection was difficult for check the SPK testing process. | In after situation, Ringtone added by which we can easily check the SPK testing and find out the abnormality of SPK. | 03/2025 | |||
| 3 | LCIK - 42316 |
quality |
Akbar Ali , 51010494 |
Before We are using the SFG online Confirmation on Pkg1 Location But in BOM SFG Location is mention Due to this Double Confirmation is Done in Order. | Now Location Correction Done after analysis in order and BOM Both side SFG Location is Done For actual Confirmation Qty. | 03/2025 | |||
| Previous 613 614 615 616 617 Next | |||||||||