Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 42311 |
quality |
Abhishek Kumar , 51010215 |
Currently no check point add in SOP to check dusty and dirty battery cover. | Now add check point in sop to check dusty and dirty on battery. | 03/2025 | |||
| 2 | LCIK - 42312 |
quality |
Priyamjit Paul , 51009135 |
In current test stage most of the time we can see 7-8 setup in smart phone. there is no unit define in SOP for current setup, most of the time we can face accumulation of next stage ( battery scanning stage ). | In current test stage, the unit of current setup must be define in SOP simply because not facing accumulation for next stage, | 03/2025 | |||
| 3 | LCIK - 42314 |
quality |
Priyamjit Paul , 51009135 |
Before situation I have no any check sheet for online. | After create check sheet we are verify software online with sop and mention in check sheet and sign on sheet.so that clear which person verify software and which line and which time. | 03/2025 | |||
| Previous 612 613 614 615 616 Next | |||||||||