Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 40229 |
quality |
Akbar Ali , 51010494 |
Earlier we used to run the line without ionizer at input stage due to which issue come at spanworm panel and dust particles due to this production hamper. | Now we have used ionizer at input stage due to which line run smoothly no Any come dust particles for the same. | 04/2024 | |||
| 2 | LCIK - 43045 |
quality |
Sumit Kumar Maurya , 59428 |
There is no any special check to check LED , due to high intensity of LED some black spots got made in operators’ eyes due to continuous heavy light reflections on the same point. | Now process of LED checking PCR has been raised to add the special check to detect the all 4 LED lamp glowing or not glowing issues by checking & comparing with reflective image of LED over the steel plate. | 08/2025 | |||
| 3 | LCIK - 43046 |
quality |
Krishna Kumar Singh , 51010395 |
In moto guru model there was a LED fixing issue LED leads are open and no any proper routing was in the speaker bracket due to this The LED can be fix shifted in the handset. | After observing & checking we suggest to design team to do improvement in middle cover for proper routing the LED leads in middle cover. than middle cover improved and issue resolved. | 08/2025 | |||
| Previous 604 605 606 607 608 Next | |||||||||