Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43294 |
Quality |
Gautam Panday , 51010547 |
Earlier we have found USB uplift issue in router stage continuous whenever we change vendor. | we have increase USB pad size in pcba so that upper tolerance and lower tolerance USB fit properly in pcba . | 10/2025 | |||
| 2 | LCIK - 43040 |
quality |
Sumit Kumar Maurya , 59428 |
In before situation, SMD component was getting damage during soldering of speaker and LED. | In after situation, developed Myler protecting the SMD component which avoiding the flux issue over SMD component. | 08/2025 | |||
| 3 | LCIK - 43041 |
quality |
Sumit Kumar Maurya , 59428 |
In Yuva 5G model scratches and dent cases are more coming ,there is a probability of dent due to data cable of metal used . | Now in this model to remove this type issue plastic data cable is used and this issue is terminate. | 08/2025 | |||
| Previous 601 602 603 604 605 Next | |||||||||