Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43289 |
Quality |
Sumit Kumar Maurya , 59428 |
We have faced bt connection issue in new model T31 at Audio. | we have increased connection time out and inquiry in tool setting then bt connection issue solved approx 20% now . Model T31. | 10/2025 | |||
| 2 | LCIK - 43034 |
quality |
Krishna Kumar Singh , 51010395 |
There are no checkpoints in line for check LED leg sorting. Markets complaints were found for the same. | Checkpoints have been given at Paste conductive cloth stage to eliminate LED Leg sorting issues. | 08/2025 | |||
| 3 | LCIK - 43290 |
Quality |
Sumit Kumar Maurya , 59428 |
Earlier, water lable was applied on all smart phones after OQA2, due to which a large number of water lable were missed during assembly. | Now in all smart phones it is installed before OQA2 which reduces the chances of water label getting into the missing assembly. | 10/2025 | |||
| Previous 598 599 600 601 602 Next | |||||||||