Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 41718 |
Quality improvement |
Krishna Kumar Singh , 51010395 |
Before situation the model Lava Z93P rf jigs running only for Z3UP after some time new model came we implemented same jigs into Z3UP model. | If new model came of Lava Z93P (Z3 UP) we are implemented Z93P rf jigs into the Z3model ,we removed some material from the base of rf jigs and running this jigs for both model of lava Z3 and Z93P models. and pogo pin removed from the base as per model wise. | 10/2024 | |||
| 2 | LCIK - 38903 |
Quality Improvement |
Roopendra Singh , 51009742 |
Laurance Kumar , 51009470 Amit Pratap Singh , 51009908 |
Earlier we using small size vinyl which not covering the whole lens area so scratch issue coming. | Now we using Big size Poly which covering the whole main lens area now Rejection rate reduce 3% to below 1%. | 08/2023 | ||
| 3 | LCIK - 38905 |
Quality Improvement |
Neeraj Mani Tripathi , 51009712 |
Neeraj Mani Tripathi , 51009712 |
In earlier production of TP LCD we past Paper Tap in front of front camera cavity at Packing stage . When this TP used at main assembly line production then we face camera dust and finger mark issue | After facing Camera dust issue at line we changed the paper tape pasting process sequence ,now we past this tape just after TP fixing stage ,so after that environmental dust and finger mark case not effected during further process. | 08/2023 | ||
| Previous 572 573 574 575 576 Next | |||||||||