Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 38624 |
Quality improvement |
Man Singh , 51009389 |
Dinesh Kumar , 51009095 Gaurav Dutt , 51010037 |
04/2023 | ||||
| 2 | LCIK - 42208 |
Quality improvement |
Sumit , 51009949 |
The camera calibration test in Model Yuva 2 5G was not a full test but a single test which could not be checked through the online system whether the camera calibration was pass or fail. | We talked to the SW team and got the camera calibration test flag added to the full test, which now detects camera calibration pass and fails in the online system. | 02/2025 | |||
| 3 | LCIK - 43233 |
Quality improvement |
Krishna Kumar Singh , 51010395 |
The Yuva 5G Unisoc chipset vendor is asking to use the CMW100 for RF testing. We don't have cmw100 for this test. | We now work with the Lightpoint team to investigate Unisoc RF testing using IQstream 5G testers. After the modification setup with the ODM tool we are now using our IQStream tester for the Unisoc chipset. | 10/2025 | |||
| Previous 564 565 566 567 568 Next | |||||||||