Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 38868
Quality Improvement
Kunal Gautam , 51009768
Kunal kumar , 372483
Dhruv , 51010036
In Yuva 2 TP assembly we have found LCD FPC damage issue in assembly line (Defect rate 1%) For Controlling the slippage issue from element room be have take below actions-\ And now defect rate is ZERO from 1% Occurrence level 1) Process mapping has been done 2) Process of Blue vinyl removing has been changed and SOP also updated for same 3) Pressing Jig modification 4) SP tray using instead of normal plastic tray to improve handling issues 5) Single tray run followed Detection Level 1) Fixed the manpower of Visual inspection in both shifts 2) Taking continuous dummy for all VI operators. 08/2023
2 LCIK - 42197
Quality improvement
Priyamjit Paul , 51009135
In before situation, SMD component was getting damage during soldering of speaker and LED. In after situation, developed Myler protecting the SMD component which avoiding the flux issue over SMD component. 02/2025
3 LCIK - 42198
Quality improvement
Priyamjit Paul , 51009135
In Yuva 5G model scratches and dent cases are more coming ,there is a probability of dent due to data cable of metal used . Now in this model to remove this type issue plastic data cable is used and this issue is terminate. 02/2025