Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 39108 |
Quality Improvement |
Sanjay Pandey , 51010365 |
RAVI KUMAR , 166456 |
Earlier We Have Deployed 2 Manpower With Same SOP At Master carton Preparation And Packing Stage Due To This Change Of Process Miss (Master Carton Seal)Not Check By operator Because Not Process Define Operator Wise, | Now We Have Update The SOP With Divide Both Operator Work Contents And Provide seprate SOP At This Stage, | 11/2023 | ||
| 2 | LCIK - 38853 |
Quality improvement |
Anuj Kumar , 51009497 |
Sandeep Pathak , 51010189 Abhin Manra , 51009366 |
In moto guru model there was a LED fixing issue LED leads are open and no any proper routing was in the speaker bracket due to this The LED can be fix shifted in the handset | . After observing & checking we suggest to design team to do improvement in middle cover for proper routing the LED leads in middle cover. than middle cover improved and issue resolved | 08/2023 | ||
| 3 | LCIK - 39622 |
Quality Improvement |
Sujeet kumar mishra , 51009224 |
Yuva 3 Battery cover gluing line battery cover uplift issue create huge qty due to Gluing machine running with 100 degree temperature using for glue heating. | After Analysis gluing heating temperature set 60 degree and battery cover uplift issue control. | 01/2024 | |||
| Previous 552 553 554 555 556 Next | |||||||||