** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 42717
we link mmi tool with mes
Sumant Kumar Yadav , 51009654
Ashish Kumar , 51009464
J.BASU , 51010276
before situation we linked only rf tool with ims.if need rf tool status then check easily but if required mmi status then we have no tracking source so we need to link with mes so that track easily. after situation if need mmi status of pcb,then we can check pcb mmi pass or not also if mmi not done of this pcb then we could not pack and at packing stage show error. 07/2025
2 LCIK - 43502
we link mmi tool with mes
Asit , 51010564
Deepak , 51010566
Alok Kumar , 406922
before situation we linked only rf tool with ims.if need rf tool status then check easily but if required mmi status then we have no tracking source so we need to link with mes so that track easily. after situation if need mmi status of pcb,then we can check pcb mmi pass or not also if mmi not done of this pcb then we could not pack and at packing stage show error. 12/2025
3 LCIK - 40008
We have used lan converter at line NG lan ports PC ,due to these our NG lan ports issue resolved.
Pawan Kumar Yadav , 51010085
As we know many PC NG due to lan ports NG , We have not used at line due to this .. 04/2024
 Previous  53  54  55  56  57 Next