Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 42717 |
we link mmi tool with mes |
Sumant Kumar Yadav , 51009654 |
Ashish Kumar , 51009464 J.BASU , 51010276 |
before situation we linked only rf tool with ims.if need rf tool status then check easily but if required mmi status then we have no tracking source so we need to link with mes so that track easily. | after situation if need mmi status of pcb,then we can check pcb mmi pass or not also if mmi not done of this pcb then we could not pack and at packing stage show error. | 07/2025 | ||
| 2 | LCIK - 43502 |
we link mmi tool with mes |
Asit , 51010564 |
Deepak , 51010566 Alok Kumar , 406922 |
before situation we linked only rf tool with ims.if need rf tool status then check easily but if required mmi status then we have no tracking source so we need to link with mes so that track easily. | after situation if need mmi status of pcb,then we can check pcb mmi pass or not also if mmi not done of this pcb then we could not pack and at packing stage show error. | 12/2025 | ||
| 3 | LCIK - 40008 |
We have used lan converter at line NG lan ports PC ,due to these our NG lan ports issue resolved. |
Pawan Kumar Yadav , 51010085 |
As we know many PC NG due to lan ports NG , We have not used at line due to this .. | 04/2024 | ||||
| Previous 53 54 55 56 57 Next | |||||||||