Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 40631 |
Quality improvement |
Gaurav Dutt , 51010037 |
Amit Kumar , 52734 |
After analysis found that this issue was due to corrugated box creasing issue. When verified Ng gift box found Ng flap creasing NG . Creasing very wide Width & shape are very deform Ceto width 2.55mm Blade thickness 1.5 | Improvement done in below two parameters:- Ceto width 2.35mm Blade thickness 1.0mm | 05/2024 | ||
| 2 | LCIK - 41143 |
Quality Improvement |
Dhruv , 51010036 |
Dhruv , 51010036 |
There is no any special check to check LED , due to high intensity of LED some black spots got made in operators’ eyes due to continuous heavy light reflections on the same point | Now process of LED checking PCR has been raised to add the special check to detect the all 4 LED lamp glowing or not glowing issues by checking & comparing with reflective image of LED over the steel plate | 08/2024 | ||
| 3 | LCIK - 36792 |
Quality improvement |
Shanky Sharma , 44454 |
There is no water mat near the water cooler on the 1st floor, due to which water is spread all over the floor. Even 6s is not correct with this. | If a water mat is placed near the water cooler on the 1st floor, then water will not spread on the floor. And Due to this 6s will also be correct. | 08/2022 | |||
| Previous 544 545 546 547 548 Next | |||||||||