Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 40858 |
Quality improvement |
Gaurav Dutt , 51010037 |
Amit Kumar , 52734 Akash kumar singh , 51009947 |
After injection molding process manual gate cutting was going on which was not proper and results in extra flash inside BOP part | 06/2024 | |||
| 2 | LCIK - 43162 |
Quality improvement |
Pushpendra Pal , 51010202 |
Shubham chand boudai , 51010132 Yashbir , 51008101 |
Mount from 16 Head nozzle. During mounting component disturbed. Diode Part No.- C2322-020212DH0-M01 | Now Mount from 8 head Nozzle . Diode Part No.- C2322-020212DH0-M01 | 09/2025 | ||
| 3 | LCIK - 36507 |
Quality Improvement |
Niket kumar , 166017 |
If a cap is put in the hole, the material will not fall down so that the material will not be wasted and a good impression will be given at the time of 6's audit. | 08/2022 | ||||
| Previous 534 535 536 537 538 Next | |||||||||