Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 42647 |
Quality improvement |
Durgesh kumar gupta , 51008626 |
Vishal , 51009466 , 51010421 |
Before we were doing the MMI Smartphone with the sampling as per standard. | Now we are doing the 100% MMI with the required parameters and control the customers failure . and improve the quality | 06/2025 | ||
| 2 | LCIK - 37784 |
Quality Improvement |
Brajesh , 51009217 |
, 51008582 Yashbir , 51008101 |
Before we are facing U801 PM IC (CO701112217) Part shifting issue in Model Lava Blaze_5G due to Vacuum leakage with normal nozzle due to part pick up surface is metallic. First time we are using this type of component in 5G. | After Part moved from mounter 7 to 6 and add Special Nozzle with rubber tip to stable pickup position (1002 to 158) and also given detection at Pre AOI. | 01/2023 | ||
| 3 | LCIK - 40600 |
Quality improvement |
ANKIT KUMAR , 166875 |
As verified there was no any process defined at input to rub finger in TP front. | >> One checkpoint defined in SOP “to check the water mark issue whose visible in naked eye. >> Added watermark phenomenon at Unpack display assembly stage SOP. | 05/2024 | |||
| Previous 532 533 534 535 536 Next | |||||||||