** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 42647
Quality improvement
Durgesh kumar gupta , 51008626
Vishal , 51009466
, 51010421
Before we were doing the MMI Smartphone with the sampling as per standard. Now we are doing the 100% MMI with the required parameters and control the customers failure . and improve the quality 06/2025
2 LCIK - 37784
Quality Improvement
Brajesh , 51009217
, 51008582
Yashbir , 51008101
Before we are facing U801 PM IC (CO701112217) Part shifting issue in Model Lava Blaze_5G due to Vacuum leakage with normal nozzle due to part pick up surface is metallic. First time we are using this type of component in 5G. After Part moved from mounter 7 to 6 and add Special Nozzle with rubber tip to stable pickup position (1002 to 158) and also given detection at Pre AOI. 01/2023
3 LCIK - 40600
Quality improvement
ANKIT KUMAR , 166875
As verified there was no any process defined at input to rub finger in TP front. >> One checkpoint defined in SOP “to check the water mark issue whose visible in naked eye. >> Added watermark phenomenon at Unpack display assembly stage SOP. 05/2024
 Previous  532  533  534  535  536 Next