Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 42642 |
Quality improvement |
Vishal , 51009466 |
Durgesh kumar gupta , 51008626 Pawan Kumar Yadav , 51010085 |
Before we were doing the sw in FP with usb port & Smart phone in jig with single pcba fixture . | Now we are doing sw in panel foam that's why control the create defects chances in FP because avoid the handling | 06/2025 | ||
| 2 | LCIK - 38291 |
Quality Improvement |
, 51008878 |
MRN area lux level not maintain due this area only emergency light available.And MRN PCBA Verification very critical. | One Tube light extra installed and lux level maintain MRN area .And PCBA verification start smoothly. | 03/2023 | |||
| 3 | LCIK - 42387 |
Quality improvement |
Vishal , 51009466 |
Vinod sapehia , 51008613 Pawan Kumar Yadav , 51010085 |
Before we have packed the smart phone PCBA in bin with 60 Qty in Bin so the PCBA was hitting during get out from bin and antenna pin was got damage or Scrap . | Now Used the ESD Tray in single PCBA packing method . | 04/2025 | ||
| Previous 529 530 531 532 533 Next | |||||||||