Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 38718
VISUAL PROCESS BEFOR GLUE
Ashish Kr Singh , 55586
Kartik Rautela , 55955
, 40004
EARLIER WE HAVE VISUAL DONE AFTER GLUE PROCESS . AFTER GLUE DONE USB UPLIFT NOT VISIBLE SO FAILURE SKIP FROM OPERATOR & FOUND IN ASSEMBLY . NOW PROCESS CHANGE & VISUAL DONE BEFOR GLUE AT POST AOI . NOW DEFECT CONTROL FOR USB UPLIFT IN ASSEMBLY . 06/2023
2 LCIK - 38785
Visual method changed .
Subhash chandra yadav , 51008656
Pawan Kumar Yadav , 51010085
Firasat ali , 51008645
Earlier we are doing only top side visual of Sub PCBA USB jack .Due to huge chances of skipage USB uplift issue. Now we started both side(top & bottom) visual inspection of Sub PCBA USB jack in model Yuva 2 PRO.After that controlled USB jack uplift issue  06/2023
3 LCIK - 39076
Visual method changed .
Pawan Kumar Yadav , 51010085
Janaki Ballav Pattanaik , 51009457
Earlier we are doing only top side visual of Sub PCBA USB jack .Due to huge chances of skipage USB uplift issue. Now we started both side(top & bottom) visual inspection of Sub PCBA USB jack in model Yuva 2 PRO.After that controlled USB jack uplift issue . 11/2023