Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43391 |
Quality improvement |
Kapil Kumar , 51010568 |
Previously, we using to manually batch check each part one by one line item in SAP. This process was time-consuming and took more than one hour to clearing the Kit posting to floor. | Now we are collaborating with the SAP team to develop the ZM2M_BATCH_CHANG T-code, which will provide a batch of all parts in a single run and all Kit posting one shot | 11/2025 | |||
| 2 | LCIK - 41345 |
Quality Improvement |
Akhilesh yadav , 51008584 |
, 51009929 |
We are facing High failure of dry Soldering issue in Model BLAZE X main board because of less solder at BGA location due to same productivity reduced and also RTY going down. | Now We modify Stencil opening from 8.2 Mil to 8.5 Mil and also stencil opening of BGA is 100% at BGA location to achieve high volume and reduce dry soldering. So now we reduce dry soldering issue and improve productivity and RTY DATA. | 08/2024 | ||
| 3 | LCIK - 41348 |
Quality improvement |
Ajay Kumar Yadav , 51010472 |
We added a checkpoint in all the models of Moto that after putting the MRP label, we did not give the checkpoint of the label anywhere. | Then after MRP, we added a checkpoint so that a boy from MRP installation and device weight will check the MRP label. | 08/2024 | |||
| Previous 521 522 523 524 525 Next | |||||||||