Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43394 |
When used PCBA run on line take Precautions of high rejection. |
Vipin kumar singh , 51008102 |
So many Handsets are Come on line for IMEI Miss Match at used PCBA because we have not known these PCBA where is hold or rejected at which condition by production. we know that if 1st IMEI write then not taken 2nd time IMEI write on line. | If We have used PCBA hold at Production end, If run on line first we have Done proper ELS after that Format OLD IMEI after that run on line so control maximum rejection of repair. | 11/2025 | |||
| 2 | LCIK - 39263 |
Weight add in Weight machine barcode |
SANJAY RUPANI , 51009511 |
, 40514 Anuj Kumar Yadav , 51008899 |
This resulted in considerable wastage of time. Now, we have incorporated weight barcodes into labels, enabling easy scanning with barcode scanners and thus increasing productivity | 12/2023 | |||
| 3 | LCIK - 43569 |
Weekly Service materials dispatch |
Dimple Kumar , 52392 |
before daily requirement of service materials through PPC team and many transection of SAP. | after we will adhere the process and request to PPC team pls send weekly requirement. For one time sap transition | 01/2026 | |||
| Previous 50 51 52 53 54 Next | |||||||||