Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 40807 |
Quality improvement |
Rajneesh pathak , 51009999 |
The manpower working on master carton sometimes forgets to paste tempered seal. | We changed the process where after making a master carton, then tempered seal is pasted, it will be then checked by Quality manpower and then will be placed on the pallet. | 06/2024 | |||
| 2 | LCIK - 42855 |
Quality improvement |
Sumit Kumar Maurya , 59428 |
Loopback test chamber is not yet installed on the third floor due to which there is a possibility of line speaker crack bypass. | Loopback chamber is used to do loopback tests on 1st floor. If loopback test chamber is also installed on 3rd floor then the operator will not have any problem with the sound coming from the tab line or it will easily cause failure like Speaker's creak voice and Speaker's low. You will be able to check. | 07/2025 | |||
| 3 | LCIK - 40808 |
Quality improvement |
Rajneesh pathak , 51009999 |
The manpower working on the weight machine work to place the handset in any direction after doing weight of the GB. | We modified the process so that after weighing the handsets we will place the GB with label in upward side on the conveyor and sent to the next stage. In this way the MRP label will be checked by the next stage operator if it is word or missing. | 06/2024 | |||