Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 41303 |
Quality improvement |
Krishna Kumar Singh , 51010395 |
Before we have small red tray for smart phone due to this some part of smart phone come out of red tray . Because of there were more chances to dent of smart phone . | Now we have arranged the big red tray for smart phone . Now smart phone proper come in red tray and no chances to dent on the smart phone . Problem solved. | 08/2024 | |||
| 2 | LCIK - 42327 |
Quality improvement |
Jaydeep Chaturvedi , 51009711 |
Loopback test chamber is not yet installed on the third floor due to which there is a possibility of line speaker crack bypass. | Loopback chamber is used to do loopback tests on 1st floor. If loopback test chamber is also installed on 3rd floor then the operator will not have any problem with the sound coming from the tab line or it will easily cause failure like Speaker's creak voice and Speaker's low. You will be able to check. | 03/2025 | |||
| 3 | LCIK - 42583 |
Quality improvement |
Pradeep Sharma , 51010040 |
Earlier, water label was applied on all smart phones after OQA2, due to which a large number of water label were missed during assembly | Now in all smart phones it is installed before OQA2 which reduces the chances of water label getting into the missing assembly. | 05/2025 | |||
| Previous 501 502 503 504 505 Next | |||||||||