** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 41303
Quality improvement
Krishna Kumar Singh , 51010395
Before we have small red tray for smart phone due to this some part of smart phone come out of red tray . Because of there were more chances to dent of smart phone . Now we have arranged the big red tray for smart phone . Now smart phone proper come in red tray and no chances to dent on the smart phone . Problem solved. 08/2024
2 LCIK - 42327
Quality improvement
Jaydeep Chaturvedi , 51009711
Loopback test chamber is not yet installed on the third floor due to which there is a possibility of line speaker crack bypass. Loopback chamber is used to do loopback tests on 1st floor. If loopback test chamber is also installed on 3rd floor then the operator will not have any problem with the sound coming from the tab line or it will easily cause failure like Speaker's creak voice and Speaker's low. You will be able to check. 03/2025
3 LCIK - 42583
Quality improvement
Pradeep Sharma , 51010040
Earlier, water label was applied on all smart phones after OQA2, due to which a large number of water label were missed during assembly Now in all smart phones it is installed before OQA2 which reduces the chances of water label getting into the missing assembly. 05/2025
 Previous  501  502  503  504  505 Next