Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 42059 |
Quality Improvement |
Biswojit barik , 51008651 |
P Sensor Dry soldering due less solder in the pad, paste at the pcba pad not getting melt properly and making contact with the part. | Now we have increased 3 mils in both length & width of stencil aperture by this issue Has been eliminated. | 01/2025 | |||
| 2 | LCIK - 42571 |
Quality improvement |
Priyamjit Paul , 51009135 |
The camera calibration test in Model Yuva 2 5G was not a full test but a single test which could not be checked through the online system whether the camera calibration was pass or fail. | We talked to the SW team and got the camera calibration test flag added to the full test, which now detects camera calibration pass and fails in the online system. | 05/2025 | |||
| 3 | LCIK - 42060 |
Quality improvement |
Sujeet kumar mishra , 51009224 |
MRN PCBA come online with mix part code and no any tracking data received for mixing. | During MRN time lose qty PCBA scanning start and share on mail and all MRN PCBA tracking data safe for any tracking. | 01/2025 | |||
| Previous 496 497 498 499 500 Next | |||||||||