Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 42569 |
Quality improvement |
Abhishek Kumar , 51010215 |
Kapil Kumar , 51010568 |
Before implement of system some time device got bay pass from battery pressing stage and there was not check available at next stage for detect that. | Mow we have implement the scanning system in battery cover pressing jig and device will be scan in IMS and it's check point has add at next stage now if device got bay pass from there then it detect at next stage | 05/2025 | ||
| 2 | LCIK - 42058 |
Quality Improvement |
Biswojit barik , 51008651 |
Earlier we were facing high failure related to Dry soldering at location CPU (U400),In model - Blaze X MB. | Now we have modified the stencil at the CPU location for increase the Solder to reduce the Dry soldering failure. Model -Blaze X MB. | 01/2025 | |||
| 3 | LCIK - 44106 |
Quality improvement |
Durgesh Yadav , 51009236 |
Rahul Kumar Gupta , 51009458 |
before using cellotape for paste barcode.then manopower unneccery use on panasim so remove from line. | now using dobble side tape for best attachment of barcode and tape | 06/2026 | ||
| Previous 495 496 497 498 499 Next | |||||||||