Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 42567 |
Quality Improvement |
Pradeep Sharma , 51010040 |
"Cause 1: High battery cover rejection rate due to repair dismentaling rate was high in blaze X model due to glue outside issue was came on line - Ng rate was- 6% Cause 2: Battery cover paint peel off problem was occurred while cleaning glue from the battery cover." | ">> Glue machine has stabled after changed glue path as per ODM standard. >> Glue machine cleaning and debugging process has improved . >> Now after all improvement glue outflow issue has reduced as compared before- Ng rate reduced 4%" | 05/2025 | |||
| 2 | LCIK - 44103 |
Quality improvement |
Durgesh Yadav , 51009236 |
Rahul Kumar Gupta , 51009458 |
top and bottom NG boards were mixed in the magazine at pre and post AOI stages | After defining the location for top and bottom, it became easy to check the board | 06/2026 | ||
| 3 | LCIK - 42056 |
Quality Improvement |
Rajneesh pathak , 51009999 |
In before situation, Torch was not Glowing in same time of entering in FT test mode in given below software version. Software version:-LAVA_A3_032_024_V1.0_M009_20230119_ENG_IN. | In After Situation , after entering in FT test Torch started glowing from same time, by this process we easily can detect the torch and avoid the LED missing Issue in below software. Software Version:-LAVA_A3_032_024_V1.0_M011_20230228_ENG_IN. | 01/2025 | |||
| Previous 494 495 496 497 498 Next | |||||||||