Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 42045 |
Quality Improvement |
Akbar Ali , 51010494 |
Earlier We are using AIR ionizer to clean the router cutting dust due to this we are facing MIC foam damage issue .. | Now we using ESD brass only to clean the router cutting dust ..after this control foam damage issue. | 01/2025 | |||
| 2 | LCIK - 42813 |
Quality improvement |
Biswojit barik , 51008651 |
Earlier we are doing only top side visual of Sub PCBA USB jack .Due to huge chances of skipage USB uplift issue. | Now we started both side(top & bottom) visual inspection of Sub PCBA USB jack in model Yuva 2 PRO.After that controlled USB jack uplift issue | 07/2025 | |||
| 3 | LCIK - 41534 |
Quality improvement |
Neeraj Mani Tripathi , 51009712 |
Repair team decide that part is vendor rejection or sometime issue then vendor how decide its not a fault and part left on the once again in line. When run on line this part then its rejection once again found in repair so hampered the line for same issue repeated. | If its validated properly after that run with proper analysis then safe to line losses and not hampered the line. | 09/2024 | |||