Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 36910 |
Quality Improvement |
Kunal Gautam , 51009768 |
Ganga Pratap Singh , 51009380 |
Before in this model issue was there are continuously coming LED Shifted in regular process. process are lock PCBA from bottom PCBA side then lock upside lock. | Now we change the process of fitment of B shell process are take B shell>>slightly led leg press >>and fit from top side >> and then bottom side. | 09/2022 | ||
| 2 | LCIK - 39982 |
Quality improvement |
Neeraj Mani Tripathi , 51009712 |
Earlier we are facing T card slot damage issue due to improper fitment of panel during top side fitment. | Now operator briefed to fit panel from down side to up side and with the help of this t card slot damage issue control. | 03/2024 | |||
| 3 | LCIK - 41262 |
Quality improvement |
Pradeep Gupta , 51010403 |
Before there are no any check point related to fg tag printing. | Now we make a process regarding fg tag verification with the help of FPA. first production will make a print and paste downside the FPA and verify all team one by one. | 08/2024 | |||
| Previous 466 467 468 469 470 Next | |||||||||