Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 41769 |
Quality improvement |
Krishna Kumar Singh , 51010395 |
we can remove any TP LCD smart phone that gets scraped for minor scratches or dents, we can remove it by making a refurbished phone for the employee or we can control the use of any TP LCD scrap that is done by this company | Now we are running a model called Blaze Curve which has a lot of scratches or dents in it so we are going to make a refurbished phone for the employee so that the company will have less loss. | 11/2024 | |||
| 2 | LCIK - 41770 |
Quality improvement |
Krishna Kumar Singh , 51010395 |
Loopback test chamber is not yet installed on the third floor due to which there is a possibility of line speaker crack bypass | Loopback chamber is used to do loopback tests on 1st floor. If loopback test chamber is also installed on 3rd floor then the operator will not have any problem with the sound coming from the tab line or it will easily cause failure like Speaker's creak voice and Speaker's low. You will be able to check | 11/2024 | |||
| 3 | LCIK - 41259 |
Quality improvement |
, 51010363 |
n Lava Hero 600I (BOP) Auto screwing Machine Screw Dispenser jig is not mention. | In Lava Hero 600I (BOP) Auto screwing Machine Screw Dispenser jig Should be mention. | 08/2024 | |||
| Previous 463 464 465 466 467 Next | |||||||||