Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43302 |
Quality improvement |
Sachin yadav , 51009625 |
Every stage of wrist band on the assembly line, operators do not turn off the wrist band switch at the shift end, on which floor there is always a lot of beep sound, there is a lot of noise. | If you want to make a line switch so that it turns on when the shift starts and turns off when the shift ends. All wrist band will remain closed and there will be no sound of beep on the floor and noise pollution will also be reduced and security will also be there. | 10/2025 | |||
| 2 | LCIK - 41255 |
Quality improvement |
Vikas Kumar , 51010409 |
At present 2 manpowers are working on Inspect middle cover and remove vinyl of middle cover and finger print and than operator fix Flash LED and fix finger prrint sensor. Both manpower do same work and due to this both manpower can not check any specific point after done their process. | Now we have distribute work between both operators one is doing fix flash PCBA and second operator work to fix finger print sensor Now finger print sensor person can check Flash LED PCBA mounting. | 08/2024 | |||
| 3 | LCIK - 39464 |
quality improvement |
Jaydeep Chaturvedi , 51009711 |
Abhishek Kumar , 51010215 |
In model lava Z33 we don't have any jig for pasting of graphite and copper foil the operator was doing work manually due to this many time we facing the issue of graphite and copper foil shifting issue and unnecessary defect getting on line and also many time during alignment it got damage and getting scrap. | now jig implement done in this model and operator is doing the work with help of jig and now we don't have any issue for Mylar shifting and unnecessary defects and material scrap issues are controlled. | 12/2023 | ||