Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43043 |
Quality improvement |
Krishna Kumar Singh , 51010395 |
Before implement of system some time device got bay pass from battery pressing stage and there was not check available at next stage for detect that. | Now we have implement the scanning system in battery cover pressing jig and device will be scan in IMS and it's check point has add at next stage now if device got bay pass from there then it detect at next stage | 08/2025 | |||
| 2 | LCIK - 41252 |
Quality improvement |
Manish prajapati , 51010516 |
Loopback test chamber is not yet installed on the third floor due to which there is a possibility of line speaker crack bypass. | Loopback chamber is used to do loopback tests on 1st floor. If loopback test chamber is also installed on 3rd floor then the operator will not have any problem with the sound coming from the tab line or it will easily cause failure like Speaker's creak voice and Speaker's low. You will be able to check. | 08/2024 | |||
| 3 | LCIK - 41508 |
Quality improvement |
Krishna Kumar Singh , 51010395 |
Before soldering jig so light that soldering manpower paste the .paper so that jig does not move but when changeover do then manpower remove the paper and gum marks comes on the mat. | When we will add a vacuum rubber then the soldering jig automatics paste with the mat as well as soldering jig do not move and when we remove the soldering jig then gum mark not come and problem solve. | 09/2024 | |||