Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 36759 |
![]() Quality Improvement |
, 51008582 |
Brajesh , 51009217 |
we facing issue of BTB connector shifting in Smartphone. | After using 307 No. Nozzle now issue not repeated. | 08/2022 | ||
2 | LCIK - 37784 |
![]() Quality Improvement |
Brajesh , 51009217 |
, 51008582 Yashbir , 51008101 |
Before we are facing U801 PM IC (CO701112217) Part shifting issue in Model Lava Blaze_5G due to Vacuum leakage with normal nozzle due to part pick up surface is metallic. First time we are using this type of component in 5G. | After Part moved from mounter 7 to 6 and add Special Nozzle with rubber tip to stable pickup position (1002 to 158) and also given detection at Pre AOI. | 01/2023 | ||
3 | LCIK - 40600 |
![]() Quality improvement |
ANKIT KUMAR , 166875 |
As verified there was no any process defined at input to rub finger in TP front. | >> One checkpoint defined in SOP “to check the water mark issue whose visible in naked eye. >> Added watermark phenomenon at Unpack display assembly stage SOP. | 05/2024 | |||
Previous 424 425 426 427 428 Next |