Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 36476 |
![]() Quality Improvement |
Man Singh , 51009389 |
, 51009055 Dinesh Kumar , 51009095 |
We are not able to check if any operator by pass the reel without inspection. | Now we have given a special Code of every operator, they type their code on reel after inspection and pass the reel, now we catch the by passing person. | 08/2022 | ||
2 | LCIK - 38526 |
![]() Quality Improvement |
Sujeet kumar mishra , 51009224 |
04/2023 | |||||
3 | LCIK - 41345 |
Quality Improvement |
Akhilesh yadav , 51008584 |
, 51009929 |
We are facing High failure of dry Soldering issue in Model BLAZE X main board because of less solder at BGA location due to same productivity reduced and also RTY going down. | Now We modify Stencil opening from 8.2 Mil to 8.5 Mil and also stencil opening of BGA is 100% at BGA location to achieve high volume and reduce dry soldering. So now we reduce dry soldering issue and improve productivity and RTY DATA. | 08/2024 | ||
Previous 414 415 416 417 418 Next |