Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43650 |
REDUCED FAILURE OF DEAD IN HMD VIBE |
Durgesh kumar gupta , 51008626 |
Vishal , 51009466 |
The existing reflow oven profile is based on an old part which has copper tinning not optimized for the latest silver tinning part which caused the extra paste after the reflow due to which 0.50% rejection in smt for same | Now after the soak time changed from the 55 sec to 68 sec the issue got resolved and rejection decreased to 0.05% | 01/2026 | ||
| 2 | LCIK - 43262 |
REDUCED FAILURE OF DEAD IN HMD VIBE |
Kartik Rautela , 55955 |
Rohit dwivedi , 51008107 Raj kamal yadav , 51008653 |
The existing reflow oven profile is based on an old part which has copper tinning not optimized for the latest silver tinning part which caused the extra paste after the reflow due to which 0.50% rejection in smt for same | Now after the soak time changed from the 55 sec to 68 sec the issue got resolved and rejection decreased to 0.05% | 10/2025 | ||
| 3 | LCIK - 37264 |
Reduced 1 M/P from LAVA Blaze 5G |
Amit Pratap Singh , 51009908 |
Abhisek kumar vishwakarma , 51009879 |
11/2022 | ||||
| Previous 412 413 414 415 416 Next | |||||||||